The first stage of construction. April through August, 2007.



Image Gallery: Stage One
April through June.
first version of stairs Main deck structure Main deck structure stairs and planking Interior steel ribs
See all 20 images.

Image Gallery: Stage Two
July and August, leading up to Burning Man 2007.
stowed for the Art Car Prade plastic panels which, I decided, looked lame and were eventually removed first version of the drive system which was used in the Minneapolis Art Car parade
See all 23 images.